IntelliSourcing
IntelliCore ยท sourcing cost engine

The cheapest FOB is rarely the cheapest landed cost

Enter FOB, quantity, tooling, sample, freight, duty, certification cost and defect rate per factory. We amortize one-off tooling and certification over the quantity to get landed cost, then compare factories on effective unit cost after defects. You also get the price your margin requires, the cash the first order needs, and the KC, FDA or CE checklist with inspection and defect terms.

Free without signup ยท nothing stored ยท not a certification or customs agent

FOB, tooling, freight and certification in USD; duty, defect and margin in %. Quantity is the first order.

Your text is not stored; results show only on screen. Factory names can be anonymized with no change.

7,350
ignoring one-off tooling, sample and certification flips the comparison
sample calc (USD)
3%
a 3% defect rate costs about 3.1% of unit price, not 3%
1 รท (1 โˆ’ rate)
2
two written quotes on identical specs are the minimum to compare
sourcing rule

How it works

Compare the cost of one unit at your door, not the FOB price.

1

Enter factory terms

FOB, quantity, MOQ, tooling, sample, freight, duty, certification, defect rate, lead time.

2

Compute landed cost

Amortize one-offs over quantity and add duty, insurance and defects.

3

Compare and set terms

Factory table, required price and cash, certification checklist, inspection and defect clauses.

What it checks

Sourcing overpays on missing costs, not on unit price.

One-off cost split

Tooling, sample and certification divided by quantity. The smaller the first order, the bigger their weight.

amortization

Duty and insurance

CIF-based duty and insurance added to reach the real landed cost. Changing the HS code changes the rate.

CIF basis

Defect-adjusted unit cost

Unit cost รท (1 โˆ’ defect rate): 3% raises cost about 3.1%.

effective cost

Factory comparison

Lowest effective cost, the gap, and the effect of changing quantity.

comparison

Required price and cash

Price needed at your target margin, and the cash the first order requires including VAT.

margin and cash

Certification and contract

KC, FDA, CE preparation items and AQL inspection, defect liability and IP clauses.

cert and contract

Pricing

The check is free. Subscriptions run 31 days from the payment day.

๋ฌด๋ฃŒ ๊ณ„์‚ฐ

0์›

๊ณต์žฅ 2๊ณณ์˜ ์ฐฉ์ง€ ์›๊ฐ€์™€ ์ƒ์œ„ 4๊ฐœ ํ•ญ๋ชฉ์˜ ๊ทผ๊ฑฐ๊นŒ์ง€ ํ™•์ธํ•ฉ๋‹ˆ๋‹ค.

  • ๊ณต์žฅ 2๊ณณ
  • ์ฐฉ์ง€ ์›๊ฐ€ ๊ณ„์‚ฐ
  • ์ƒ์œ„ 4๊ฐœ ํ•ญ๋ชฉ ์ƒ์„ธ
  • ์›๋ฌธ ์ €์žฅ ์—†์Œ
Start free

์†Œ์‹ฑ ์Šคํƒ€ํ„ฐ

โ‚ฉ89,000 / 31์ผ

๊ณต์žฅ 5๊ณณ ๋น„๊ต ยท ์ธ์ฆ ์ฒดํฌ๋ฆฌ์ŠคํŠธ 1์ข… ยท ๋ฐœ์ฃผ ์กฐ๊ฑด์„œ

  • ๊ณต์žฅ 5๊ณณ
  • ์ธ์ฆ ์ฒดํฌ๋ฆฌ์ŠคํŠธ
  • ๋ฐœ์ฃผ ์กฐ๊ฑด์„œ
  • PDF ๋ฆฌํฌํŠธ
  • 31์ผ ๋ณด๊ด€
Pay by card

์†Œ์‹ฑ ํ”Œ๋Ÿฌ์Šค

โ‚ฉ249,000 / 31์ผ

๊ณต์žฅ 20๊ณณ ยท 3๊ฐœ ์‹œ์žฅ ์ธ์ฆ ยท ๊ณ„์•ฝ ์กฐํ•ญ ๊ฒ€ํ† 

  • ๊ณต์žฅ 20๊ณณ
  • KCยทFDAยทCE ์ฒดํฌ
  • ๊ณ„์•ฝ ์กฐํ•ญ ๊ฒ€ํ† 
  • ํ™˜์œจ ์‹œ๋‚˜๋ฆฌ์˜ค
  • ์šฐ์„  ์ง€์›
Pay by card

์†Œ์‹ฑ ํŒŒํŠธ๋„ˆ

โ‚ฉ590,000 / 31์ผ

ํ’ˆ๋ชฉ ์—ฌ๋Ÿฌ ๊ฐœ ยท ๊ณต์žฅ ์‹ค์‚ฌ ์ฒดํฌ ยท ๋ฐœ์ฃผ~๊ฒ€์ˆ˜ ์›Œํฌํ”Œ๋กœ

  • ํ’ˆ๋ชฉ 10๊ฐœ
  • ๊ณต์žฅ ์‹ค์‚ฌ ์ฒดํฌ๋ฆฌ์ŠคํŠธ
  • ๊ฒ€์ˆ˜ ์›Œํฌํ”Œ๋กœ
  • API ์—ฐ๋™
  • ์ „๋‹ด ์ง€์›
Pay by card

Team / agency

Multiple sites, API, white-label reports.

Questions

Why is total cost higher when FOB is lower?

One-off tooling, sample and certification plus freight. On a small first order, $4,500 tooling adds $1.50 per unit. This calculation amortizes those costs over the quantity.

How do I set the duty rate?

Use the rate for your HS code. The code depends on material and function, and an FTA can make it 0%. Confirm the code with a customs broker or the customs service first.

How are defects reflected?

You must produce extra to ship good units, so unit cost is divided by (1 โˆ’ defect rate): 3% adds 3.09%, 5% adds 5.26%. Recovering it needs an AQL inspection standard and a liability clause.

Who obtains KC certification?

The importer selling in Korea. A factory certificate counts only if the model and parts match. Electrical and household goods split into safety certification, safety confirmation and supplier conformity.

When is FDA needed?

Selling medical devices, cosmetics or food in the US. Devices need 510(k) depending on class; cosmetics need facility registration and product listing. Requirements vary widely by item โ€” confirm before exporting.

IntelliSourcing estimates cost from the quotes, rates and defect data you enter. Actual duty, VAT and clearance costs depend on HS code, origin, FTA treatment and exchange rate, and certification requirements depend on product classification and current rules. We do not obtain certifications or clear goods. Not legal advice.